top of page
Harrods of London
The works involved the replacement of 15 HV substations supplying the store and ‘back of house’ areas. The new equipment was located at basement and roof levels and included transformers, HV / LV switchgear and cabling.
This was a complex infrastructure project in a prestigious location that required multiple phases and out of hours working to ensure this flagship store was not disrupted at any time.
bottom of page