ION were engaged by the developer for the design of the utility infrastructure required for the construction of Phase 2 of the development at Adanac Business Park. This comprised two blocks totalling 115,000 sqft plus an additional 20,000 sqft of mezzanine. There was also the potential to develop a plot north of the existing overhead power lines which would add a further 120,000 sqft to the site. All buildings are for light general industrial use.

ION liaised closely with the utility providers and managed the various applications to the DNO. Detailed negotiation with SSEN was required to ascertain that adequate power capacity was available to service the site, plus detailed infrastructure planning was needed to locate new substations, maximising flexibility for the future.